You don't have javascript enabled. Good luck with that.
Pencarian
 Terdampak Proyek Tol Becakayu, 100 Lampu PJU di Kalimalang Rusak

Street Lights along Jalan Raya Inspeksi Kalimalang Malfunctioned

As many as 100 street lights and 10 poles along Jalan Raya Inspeksi Kalimalang, East Jakarta, malfunctioned. It was because the uninstallation was not in accordance to the procedure by some executive officers of Bekasi , Cawang, Kampung Melayu toll road construction project.

Many street lights are malfunctioned due to being dredged with backhoe

Head of East Jakarta Industry and Energy Sub-Department, Saukhani stated, those malfunctioned hundreds lights are now stored in warehouse. His party, he told, did not get any compensation for the broken.

Jl Raya Inspeksi Kalimalang Colored With Street Light

"Many street lights are malfunctioned due to being dredged with backhoe. They're should have been uninstalled slowly and gradually," he expressed, Monday (10/19).

He disclosed, usually when contractor is about to uninstall the pole, they will contact his institute. But, they did not do that on the toll road project thus many poles and lights broken.

"The poles are crooked. It can only be used for emergency or in residential," he disclosed.

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1098 personFolmer
  2. Low Emission Zones: Jakarta’s Concrete Step to Curb Air Pollution

    access_time13-04-2026 remove_red_eye1034 personAldi Geri Lumban Tobing
  3. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye870 personAldi Geri Lumban Tobing
  4. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye839 personTiyo Surya Sakti
  5. Pademangan Health Center Promotes 3M Plus to Prevent Dengue Fever

    access_time14-04-2026 remove_red_eye736 personAnita Karyati